![]() ![]() |
|
![]() |
inspection and lpg sealing |
• Homepage » PEUGEOT MODELS (FAULTS AND SOLUTIONS) » All Questions About Your Vehicle |
08.05.2020 17:12 | # 1 |
![]() |
|
|
08.05.2020 17:12 | # 2 |
![]() |
|
My teacher, Kumburgaz, is in the holy and architectural, click for details
|
08.05.2020 17:12 | # 3 |
![]() |
|
Hodja, I found information in the following, if the date on the lpg tank is 4 digits (example: 04/12) you need to get a lpg sealing report, if the date on the lpg tank is 6 digits (example: 04/2012) there is no need to get a lpg sealing report. In the first assembly, both conditions are mandatory. Click for details. |
08.05.2020 17:12 | # 4 |
![]() |
|
[QUOTE = Serco05] Sir, I found some information, if the date on the lpg tank is 4 digits (example: 04/12) you need to get a lpg leak proof report, if the date on the lpg tank is 6 digits (example: 04/2012) not necessary. In the first assembly, both conditions are mandatory. Click for details. [/ QUOTE] thank you for your interest. Now there is a 6-digit date on the tank, no report is received, but is it slightly faulty after the inspection. & nbsp;
|
08.05.2020 17:12 | # 5 |
![]() |
|
Yeah teacher exactly like that
|
08.05.2020 17:12 | # 6 |
![]() |
|
I went to the industry yesterday, the master sealing report was removed, they said they don't want it anymore. In December, it is necessary to give the examination, which is valid until December.Normally, the month of December 2014 should be given.
|
08.05.2020 17:12 | # 7 |
![]() |
|
The leak report is removed yes, but if the date is 4 digits in the lpg tank (example: 06/12), they want a leak report because there is a possibility of year and month confusion. If the date is 6 digits (example: 06/2012) a slight defect is counted. The examination period of passenger cars is still 2 years, a mistake was made in the transaction of the friend. You can find the information on Tüvtürk's official website by clicking here. < br> |
08.05.2020 17:12 | # 8 |
![]() |
|
I just wanted new sealing wanted to get crazy ztn 10 min work & nbsp;
|
08.05.2020 17:12 | # 9 |
![]() |
|
[QUOTE = sensation61] I just wanted new sealing, get crazy ztn 10 min work & nbsp; [/ QUOTE] After the first assembly, lpg tank production is requested regardless of the date, but if the date is 6 digits, the sealing report is requested Not wanted. |